Aarrow Fires Gas Stove Stove User Manual


 
Aarrow Sherborne GSL CF 7
INSTALLATION INSTRUCTIONS
TECHNICAL DATA
Natural
Gas
Gas
Category
I2H
NOx Class
Unclassified
Table 1
Fig. 3
Efficiency
Class
CLASS 2
INSTALLING THE STOVE
A CORGI qualified gas engineer MUST install the stove
in accordance with the following regulations and stan-
dards:-
The Gas Safety (Installation and Use) Regulations
current edition.
The Building Regulations for England and Wales 2000
ref; Approved Document J 2002 edition (issued by the
DTLR).
The Building Standards (Scotland) (Consolidation)
Regulations.
BS5440 parts 1 and 2 BS5871 And these Installation
Instructions.
Warning: Failure to comply with the regulations,
requirements, or these instructions will invalidate the
guarantee and could have hazardous consequences.
IMPORTANT
Please note that in tight recesses the gas supply point
may be inaccessible. Therefore it may be necessary to
route the pipe for the gas supply before installing the
stove into its recess.
LPGGas Type
I3P
Supply
Pressure
20mbar
37mbar
Bray 82/160Bray 82/400
Injector
Max. Heat
Setting
6.1 kW
Heat Input
(gross)
Gas Rate
0.55m
3/
hour
5.7kW
0.21m
3/
hour
Min. Heat
Setting
2.5 kW
Heat Input
(gross)
Gas Rate
0.23m
3/
hour
2.5kW
0.09m
3/
hour
CLASS 2
Unclassified
Country Of
Use
AT,DK,ES,FI,
GB,GR,IE,IT,
NO,PT,SE
ES,FR,GB,
GR,IE,IT,PT
Gas Council
Id Number
32-248-06
32-248-07