Aarrow Fires Gas Stove Stove User Manual


 
ASSEMBLE RECEIVER
Important
The remote system is intended for use with original Aarrow parts only.
1) Carefully push the multi block connector on to the connection within the reciever unit as shown in Fig
17a. This connector can only fit one way, so ensure the slot in the recievers board lines up with the mould-
ing within the multi block connection.
2) Next, connect the angled spade connectors to the motor, note there are two different sized connectors and
these can only be fitted to the appropriate sized spade tab. The remaining narrow spade connectors fit to the
spade tabs on the micro switch. These are not handed, see Fig. 17b.
3) Place the double sided adhesive tape to the underside of the reciever unit. Slide back the cover and insert
the 4x AA/LR6 1.5v batteries into unit, observing the correct polartity as marked on the unit. Re-place
cover. Fig. 17c.
CAUTION! Ensure the batteries are inserted AFTER the motor is wired. A short circuit can
destroy the electrical components.
4) Position the reciever unit, as shown in Fig. 17d onto the space provided on the valve bracket. Affix the
underside of the unit with the double sided tape. Take care to route the wiring harness away from any hot
parts and do not obstruct the valve controls. The reciever unit works by ultrasonic so ensure that the reciev-
ing round grill is facing to the front of the stove.
20 Aarrow Sherborne GSL CF
INSTALLATION INSTRUCTIONS
Fig. 17a
Fig. 17b
SLOT
Fig. 17c
Fig. 17d