Wayne-Dalton 6100 Garage Door Opener User Manual


 
7
Tools Needed:
Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your
local yellow pages/business listings or go to the Find a Dealer section online at www.wayne-dalton.com
None
Attaching Quick Install Flag
Angles to Vertical Tracks
NOTE: If you have fully adjustable
flagangles, skip this step and complete
Step 2.
Place the lower quick install tab of the
flagangle in the quick install feature of
the vertical track. Give the flagangle 1/4
turn to lock in place. Repeat for other
side.
NOTE: After completing this step,
continue with Step 3.
QUICK INSTALL TAB UNLOCKED QUICK INSTALL TAB LOCKED
FLAGANGLE
VERTICAL
TRACK
1
LEFT HAND TRACK AND FLAGANGLE
RIGHT HAND TRACK AND FLAGANGLE
FLAGANGLE
VERTICAL
TRACK
INSTALLATION
Installation
Begin the installation of the door by checking the opening. It must be the same size as the door. Vertical jambs must be plumb with
header. Side clearance, from edge of door to wall, must be a minimum of 3-1/2” (89mm) on each side.
IMPORTANT: STAINLESS STEEL OR PT 2000 COATED LAG SCREWS MUST BE USED WHEN INSTALLING CENTER BEARING BRACKETS,
END BRACKETS, JAMB BRACKETS, OPERATOR MOUNTING/SUPPORT BRACKETS AND DISCONNECT BRACKETS ON TREATED LUMBER
(PRESERVATIVE-TREATED). STAINLESS STEEL OR PT 2000 COATED LAG SCREWS ARE NOT NECESSARY WHEN INSTALLING PRODUCTS
ON UNTREATED LUMBER.
NOTE: It is recommended that 5/16” lag screws be pilot drilled using a 3/16” drill bit prior to fastening.