Wayne-Dalton 6100 Garage Door Opener User Manual


 
Tools Needed:
33
Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your
local yellow pages/business listings or go to the Find a Dealer section online at www.wayne-dalton.com
Trolley Operator
OPERATOR MUST BE TESTED AT TIME
OF INSTALLATION AND MONTHLY
THEREAFTER AS DESCRIBED IN YOUR
INSTALLATION INSTRUCTIONS AND
OWNER’S MANUAL, TO ENSURE THAT
DOOR SAFETY FEATURES FUNCTION.
FAILURE TO TEST OR MAKE ANY
NECESSARY ADJUSTMENTS OR
REPAIRS, CAN RESULT IN SEVERE OR
FATAL INJURY
1. Install operator rail 1/2” to 1-1/2”
(13 - 38 mm) above high arc of top
section of the door.
2. Mount operator to ceiling so that
1” to 1-1/2” (25 - 38 mm)
clearance is maintained between
trolley rail and top section when
door is fully open (trolley rail will
slope down towards rear).
3. Attach door arm to operator bracket
installed in Step 14 with clevis and
cotter pin.
4. Attach operator to a suitable
mounting surface (2” x 6”) lumber
minimum.
5. Attach operator to ceiling framing
members.
IMPORTANT: ANGLES MUST BE
ATTACHED SECURELY TO FRAMING
MEMBER(S).
WARNING
SUITABLE MOUNTING
SURFACE (2” X 6”)
LUMBER MINIMUM
OPERATOR RAIL
CLEVIS PIN
OPERATOR
FRAMING MEMBERS
PERFORATED ANGLE
OPERATOR
RAIL
PERFORATED
ANGLE
COTTER PIN
DOOR ARM
OPTIONAL INSTALLATION