29
Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your
local yellow pages/business listings or go to the Find a Dealer section online at www.wayne-dalton.com
Tools Needed:
Tools Needed:
INSTALLATION
Place vice clamps onto both vertical
tracks just above the third roller. This is
to prevent the garage door from raising
while winding counterbalance spring(s).
FAILURE TO PLACE VICE CLAMPS
ONTO VERTICAL TRACK CAN
ALLOW DOOR TO RAISE AND
CAUSE SEVERE OR FATAL
INJURY.
IMPORTANT: DO NOT USE IMPACT GUN
TO WIND SPRING(S).
Securing Door
for Spring Winding
TRACK
VICE CLAMPS
ATTACHED TO
INNER RAIL
OF TRACK
(2) Vice Clamps
Locking Pliers
Flat Tip
Screwdriver
Wire Cutters
Rotate the cable drum until the set
screw faces directly away from the
header. TorqueMaster
®
spring tube cam
peak should be pointing straight up.
Beginning with the right side, loosen
the set screw approximately two turns,
to adjust cable. Using locking pliers,
pull on the end of the cable to remove
all cable slack.
Check to ensure the cable is aligned
and seated in the first groove of the
cable drum. Snug the set screw, then
tighten an additional 1-1/2 turns. Cut
excess cable.
Cable Adjustments
29
30
PLACE VICE
CLAMPS ABOVE
3RD ROLLER
COUNTERBALANCE
CABLE
SET SCREW
CABLE
DRUM
CAM PEAK
STRAIGHT UP
WARNING