Wayne-Dalton 46 Door User Manual


 
18
Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your
local yellow pages/business listings or go to the Find a Dealer section online at www.wayne-dalton.com
Tools Needed:
Tools Needed:
12
11
Vertical Track
Stacking Sections
3/16” Drill Bit
Power Drill
7/16” Socket
Driver
Tape Measure
Level
Power Drill
7/16” Socket
Driver
BOTTOM SECTION
5/16 X 2” HEX
HEAD LAG
SCREWS
FLAGANGLE
VERTICAL
TRACK
ASSEMBLY
JAMB
BRACKET
VERTICAL TRACK
ROLLER
JAMB BRACKET
5/16” X 2”
HEX HEAD
LAG SCREW
FLAGANGLE HOLE
SELECTION
LOCK SECTION
NOTE: For door section identification
see page 4.
NOTE: Make sure hinges are flipped
down, when stacking another section
on top.
With assistance, lift second section and
guide rollers into the vertical tracks.
Keeping the ends of the sections
aligned, install remaining section(s),
except top section, in same manner.
Now flip up hinge leaf, and fastening
center hinges first, and end hinges last,
using (2) 1/4”- 14 x 5/8” self tapping
screws. Repeat for other section(s)
except top section.
NOTE: Install lock at this time (sold
separately) See instructions in
OPTIONAL SIDELOCK INSTALLATION on
page 33.
IMPORTANT: THE TOPS OF THE VERTICAL
TRACKS MUST BE LEVEL FROM SIDE
TO SIDE. IF THE BOTTOM SECTION WAS
SHIMMED TO LEVEL IT, THE VERTICAL
TRACK ON THE SHIMMED SIDE, MUST BE
RAISED THE HEIGHT OF THE SHIM.
Position the left hand vertical track
assembly over the rollers of the bottom
section. Make sure the counterbalance
cable is located between the rollers and
the door jamb. Drill 3/16” pilot holes for the
lag screws.
If installing an idrive
®
opener: Raise the
track so that the bottom of the track is 1”
higher than the bottom of the door.
For non-idrive
®
operated garage doors:
Install the track so that it is aligned with
the bottom of the door.
Loosely fasten jamb brackets and flagangle
to the jamb using 5/16” x 1-5/8” hex head
lag screws. Tighten bottom jamb bracket
lag screw securely to the jamb to maintain
5/8” spacing. Hang cable drum over
flagangle. Repeat for the right side.
5/8”