Wayne-Dalton 341458 Garage Door Opener User Manual


 
27
Tools Needed:
Tools Needed:
Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your local
yellow pages business listings or go to the Find a Dealer section online at www.Wayne-Dalton.com
INSTALLATIONINSTALLATION
None
To install drum wraps, position the left
hand drum wrap over the left hand
drum, align with counterbalance cable;
slide groove in drum wrap towards the
left until tabs snap over drum in
between drum and ratchet gear. Repeat
for right hand side.
IMPORTANT: RIGHT AND LEFT HAND
ARE ALWAYS DETERMINED FROM INSIDE
THE GARAGE LOOKING OUT.
Drum Wrap Installation
25
DRUM WRAP
(LEFT HAND)
DRUM
(LEFT HAND)
COUNTERBALANCE
CABLE
Winding Springs Continued...
To wind the spring, rotate the winding shaft
clockwise, while watching the mark on the
winding shaft. Rotate the winding shaft to
the required number of turns for your door.
Then return to the right hand side and
wind the right hand spring to the required
number of turns. Place pawl knob in lower
position on both sides.
IMPORTANT: Mark number of spring
turns on TorqueMaster
®
Plus end bracket
warning tag(s).
NOTE: Since total turns to balance door
can deviate from SPRING TURN CHART
values by ± 1/2 turn, adjustments to the
recommended number of turns may be
required AFTER rear hangers assembly is
completed.
IMPORTANT! HOLD THE DOOR DOWN TO
PREVENT IT FROM RISING UNEXPECTEDLY
IN THE EVENT THE SPRING WAS
OVERWOUND AND CAUTIOUSLY REMOVE
VICE CLAMPS FROM VERTICAL TRACKS.
IMPORTANT! ADJUSTMENTS TO THE
RECOMMENDED NUMBER OF TURNS MAY
BE REQUIRED. IF DOOR RAISES OFF THE
FLOOR UNDER SPRING TENSION ALONE,
THEN REDUCE SPRING TENSION UNTIL
DOOR REST ON THE FLOOR. IF THE DOOR
IS HARD TO RAISE OR DRIFTS DOWN ON
ITS OWN, THEN ADD SPRING TENSION.
Spring Turns
Door Height Spring Turns
(6’ - 0”) 14
(6’ - 3”) 14 - 1/2
(6’ - 5”) 15
(6’ - 6”) 15
(6’ - 8”) 15 - 1/2
(6’ - 9”) 15 - 1/2
(7’ - 0”) 16
(7’ - 3”) 16 - 1/2
(7’ - 6”) 17
(7’ - 9”) 17 - 1/2
(8’ - 0”) 18
Number of Installed Spring Turns
LOCATION FOR
MARKING NUMBER
OF INSTALLED
SPRING TURNS
BACK OF TORQUEMASTER
®
PLUS END BRACKET WARNING TAG(S)
GROOVE
IN DRUM
TABS