Wayne-Dalton 341458 Garage Door Opener User Manual


 
15
Tools Needed:
Tools Needed:
Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your local
yellow pages business listings or go to the Find a Dealer section online at www.Wayne-Dalton.com
INSTALLATION
Vertical Track
IMPORTANT: THE TOPS OF THE
VERTICAL TRACKS MUST BE LEVEL
FROM SIDE TO SIDE. IF THE BOTTOM
SECTION WAS SHIMMED TO LEVEL IT.
THE VERTICAL TRACK ON THE SHIMMED
SIDE, MUST BE RAISED THE HEIGHT OF
THE SHIM.
Position the left hand vertical track
assembly over the rollers of the bottom
section. Make sure the counterbalance
cable is located between the rollers
and the door jamb. Drill 3/16” pilot
holes for the lag screws. Loosely fasten
jamb brackets and flagangle to the
jamb using 5/16” x 1-5/8” lag screws.
Tighten lag screw securing bottom
jamb bracket to jamb, to maintain
5/8” spacing. Hang cable drum over
flagangle.
Repeat for the right hand side.
BOTTOM
SECTION
BOTTOM SECTION
VERTICAL TRACK
ROLLER
5/16” X 1-5/8”
LAG SCREWS
FLAGANGLE
VERTICAL
TRACK
ASSEMBLY
CABLE
JAMB
BRACKET
3/16” Drill Bit
Power Drill
7/16” Socket
Driver
Tape Measure
Level
8
LAG
SCREW
QUICK INSTALL
JAMB BRACKET
CABLE
DRUM
15R Q.I. FLAGANGLE
LAG
SCREW
LOCATIONS
5/8”
Bottom Section
Before installing the bottom section,
the weather seal (may not be included)
must be temporarily installed on both
jambs and header (see PREPARING THE
OPENING on page 10).
Center the bottom section in the door
opening. Level section using wooden
shims (if necessary) under the bottom
section.
Level
BOTTOM SECTION
DOOR OPENING
WEATHER SEAL
WOODEN SHIMS
(IF NECESSARY)
LEVEL
15R FULLY ADJUSTABLE
FLAGANGLE
LAG
SCREW
LOCATIONS