Baxi Potterton 30 HE Fan User Manual


 
12.0 Completion
34
© Baxi Heating UK Ltd 2007
12.1 Completion
1. Hinge the facia panel upwards and refit the case front
panel. Tighten the securing screws (Fig. 52).
2. Instruct the user in the operation of the boiler and
system, explaining the operational sequence.
3. Carefully read and complete all sections of the
Benchmark Commissioning Checklist at the rear of this
publication that are relevant to the appliance and
installation. These details will be required in the event of
any warranty work. The publication must be handed to
the user for safe keeping and each subsequent regular
service visit recorded.
4. For IE, it is necessary to complete a “Declaration of
Conformity” to indicate compliance with I.S. 813. An
example of this is given in I.S. 813 “Domestic Gas
Installations”. This is in addition to the Benchmark
Commissioning Checklist.
5. Hand over the Users Operating, Installation and
Servicing Instructions, giving advice on the necessity of
regular servicing.
Fig. 52
Facia Panel
Case Front Panel