Page 7-2 LINE REPORTS SETUP
TS-TPI Installation and Wiring Guide
Reports Schedule Menu
Line Compliance Report:
The Line Compliance Report will include one year’s worth of 0.2 gph monthly compliance tests for a
selected line, or all lines. The most recent test is shown first and the oldest test last. After a year, the
oldest test will be dropped when a new test passes.
Follow the following steps to schedule the line compliance report. All other line reports follow this
same process. The rest of this section of the manual will only describe the report. To schedule the
diferent line reports follow this same process under each of the report menus.
LINE COMP
*
Only with Line Leak Detector(s)
LINE COMPLIANCE Use
UP/DOWN
to show choices.
SCHEDULE
NONE (select schedule – see TABLE 7.1)
TIME 1
00.00.00 to 23.59.59 (input time – see TABLE 7.2)
TIME 2
00.00.00 to 23.59.59 (input shift # 2 time... N/A if not SHIFT)
TIME 3
00.00.00 to 23.59.59 (input shift # 3 time... N/A if not SHIFT)
FAX
NO or YES (yes requires optional fax / modem)
PRINTER
YES or NO Press ENTER to accept this data.
Line Diagnostics Report:
This report is typically used by service technicians to diagnose line test issues. This report is not
typically scheduled.
Line Test Report:
This report shows the latest line leak tests for a selected line or all lines. The number of passed Gross
(3 gph) line tests passed for the day is shown first and is followed by the most recent Annual (0.1 gph)
or Monthly (0.2 gph) line test results.
Line Test History Report:
This report shows a history of line test reports