Franklin TS-TPI Water Pump User Manual


 
5
Page 5-4 TPI AND LINE LEAK TESTING
TS-TPI Installation and Wiring Guide
LN Line (leak) LN Line (leak)
LN Line (leak) LN Line (leak)
LN Line (leak)
TT
TT
T
ests Menests Men
ests Menests Men
ests Men
uu
uu
u
* Only the No. of lines that are programmed in System menu are displayed
FAIL OG Will go Active when any (3 gph, 0.2 gph, and 0.1 gph)
LINE TEST FAIL OUTPUT GROUP Line Leak Test fails
LINE 1
LINE 2 * Press (
M) key to select a LINE#.
:* Use
UP/DOWN
keys to show more choices.
LINE 8 *
LINE TEST FAIL OUTPUT GROUP N
(32 Output Groups (OGs) available...
See Tank Sentinal Setup
Programming Guide, Worksheet 12-1)
NONE
Not assigned to an Output Group (OG).
GROUP A-FF One OG selected (A=1st OG, FF=32nd OG)
ALL GROUPS All OGs selected
Use UP/DOWN
keys to choose an OG.
Press ENTER to accept this data.
FAULT OG Will go active when a fault (TS-LLD flashing alarm
LINE TEST FAIL OUTPUT GROUP error-code) occurs
LINE 1
LINE 2 * Press (M) key to select a LINE#.
:* Use UP/DOWN
keys to show more choices.
LINE 8 *
LINE TEST FAULT OUTPUT GROUP N
(32 Output Groups (OGs) available...
See Tank Sentinal Setup
Programming Guide, Worksheet 12-1)
NONE
Not assigned to an Output Group (OG).
GROUP A-FF One OG selected (A=1st OG, FF=32nd OG)
ALL GROUPS All OGs selected
Use UP/DOWN
keys to choose an OG.
Press ENTER to accept this data.