Reference Manual
300560EN, Rev AA
May 2011
2-7
Rosemount 2230
Section 2. Overview
2.3.1 Raptor System
Start-up
The standard start-up procedure of a Raptor system that includes devices
such as the 2160 Field Communication Unit, 2410 Tank Hub, 5900S Radar
Level Gauge, and the 2240S Multi-input Temperature Transmitter can be
summarized in the following brief description:
1. Install the devices on the appropriate locations.
2. Assign Modbus addresses
(1)
for the Rosemount 2410 Tank Hub, level
gauges such as the 5900S Radar Level Gauge, and auxiliary tank
devices (ATD) such as the 2240S Multi-input Temperature Transmitter.
The Modbus addresses will be stored in the built-in databases of the
Rosemount 2410 Tank Hub and the Rosemount 2160 Field
Communication Unit.
3. Verify that the total current consumption of devices connected to the
Tankbus does not exceed 250 mA
(2)
.
4. Wire the devices.
• Connect field devices to the Tankbus.
Note! Devices must be configured in the tank database
(1)(2)
of the
Rosemount 2410 Tank Hub in order to be able to communicate on the
Tankbus.
• Connect the Rosemount 2410 Tank Hub to the Rosemount 2160 Field
Communication Unit.
• Connect the Rosemount 2160 Field Communication Unit to the control
room PC with TankMaster software. The 2160 may be connected via a
Rosemount 2180 Field Bus Modem, or directly via RS 232 or RS 485.
5. Install the TankMaster software in the control room PC.
6. Configure the Raptor devices by using the TankMaster WinSetup
configuration tool as described in the Rosemount Raptor System
Configuration Manual (Document no. 300510EN).
See the reference manuals for other devices in the Raptor system for further
information on installation and configuration.
(1) See the Rosemount Raptor System Configuration Manual (Document no. 300510EN) for
more information
(2) See the Rosemount 2410 Tank Hub Reference Manual, Document No. 300530EN for more
information