Country Flame INGLS 24-N Indoor Fireplace User Manual


 
Version 1.0b
25
PROPANE FUEL CONVERSION INSTRUCTIONS
The Inglenook gas log kit is shipped from the Country Flame factory set for 65,000 Btu/hr natural gas fuel
usage; however, conversion kits may be purcahsed from Country Flame to convert the Inglenook gas log kit
to different fuels; propane or natural gas. The Inglneook gas log conversion kit contains different
repalcement parts depending on the fuel type specified. Fuel conversion requires adjustment to the control
valve, the burners, and the pilot system. Refer to TABLE 3 for the correct gas pressures corresponding to
the conversion kit being used.
WARNING: Conversion kits shall be installed by a qualified service agency in accordance with the
manufacturer’s instructions and all applicable codes and requirements of the authorized agency having
juristriction. If the information in these instructions are not followed exactly, a fire, explosion or production of
carbon monoxide may result causing property damage, personal injury or loss of life. The qualified service
agency is responsible for the proper installation of this kit. The installation is not proper and complete until the
operation of the converted appliance is checked as specified in the owner instructions supplied with the kit.
STEP 1 Turn the control knob to the OFF position and turn off the gas supply to the valve.
STEP 2 Remove control knob extentions from the valve. Allow system to cool before proceeding.
STEP 3 Remove the control panel by removing the two screws located at the top of the panel.
Disconnect the wire from back of piezoelectric igniter. Disconnect wires from on/off switch
and variable speed control if required.
STEP 4 Refer to FIGURE 24 and using a Torx T20 screwdriver, remove and discard the three pressure
regulator mounting screws (Item A), the pressure regulator tower (Item B), and the diaphragm
assembly (Item C).
FIGURE 24: SIT 820 NOVA mV GAS CONTROL VALVE
STEP 5 Refer to FIGURE 24. Ensure that the rubber gasket (Item D) is properly positioned and install
the new HI/LO pressure regulator assembly to the valve using the supplied screws (Item E).
Tighten screws securely.
STEP 6 Attach the enclosed "conversion" label near the certification label.
STEP 7 Re-attach all wiring to the fan control knob and the piezoelectric igniter. Replace the access
panel and tighten the two screws. Replace the control knobs.
STEP 8 Remove the door, the logs, and the embers, noting the position of each log as it is removed.
STEP 9 Remove the two screws holding the ember tray in place. Lift up the ember tray and remove.