15
Figure 13: Attic Offset
Figure 12: Vertical Vent Tee Installation
Figure 14: Vertical Vent Termination
Table 9: Minimum Vent Height Above Roof
d. Install storm collar on vent pipe immediately
aboveashing.Applysealantbetweenventpipe
and storm collar.
e. Attach Vent Terminal.
7. Install condensate drain line. Use 3/8 inch i.d. high
temperatureexibletubingsuchassiliconerubber
or EPDM. See Figure 12.
a. Form condensate trap with 6 inch diameter loop.
Secure loop with plastic cable tie. Fill with
water.
b. Secure to vertical vent tee with hose clamp or
plastic cable tie.
c. Runcondensatedrainlinetooordrainor
condensate pump. Condensate disposal must be
acceptable to authority having jurisdiction.
Roof Pitch Minimum Height [H]
Flat to 6/12 1 ft.
Over 6/12 to 7/12 1 ft. 3 in.
Over 7/12 to 8/12 1 ft. 6 in.
Over 8/12 to 9/12 2 in.
Over 9/12 to 10/12 2 ft. 6 in.
Over 10/12 to 11/12 3 ft. 3 in.
Over 11/12 to 12/12 4 ft.
Over 12/12 to 14/12 5 ft.
Over 14/12 to 16/12 6 ft.
Over 16/12 to 18/12 7 ft.
Over 18/12 to 20/12 7 ft. 6 in.
Over 20/12 to 18/12 8 ft.