The foam blocks provided are to hold
filler board tight against window
channel. Cut block 6.4 mm (‘A”) wider
than channel and wedge into place.
Wlndow
channel
10. Place cabinet in window by turning cabinet
to one side to get one filler board into window
channel. Now maneuver other filler board into
window channel. Reaching through window
opening, push filler boards from outside as
far toward you as they will go. Extend the
side mounting slides outward into the window
channels on both sides. Pull the cabinet
toward you to position the side mounting
slides as far forward in the window channels
as possible. Now, mark and drill a pilot hole
(2.4 mm [3/z”]) in each side mounting slide for
the wood screws. The screws are used to
secure the side mounting channels into the
window channels. Be sure to use the foam
blocks that are provided.
Wlndow channel
BE SURE THE CABINET DOES NOT FALL
OUT OF WINDOW.
11. Lower window and level air conditioner.
Lower the window firmly behind window
gasket. Leveling the cabinet is not required in
a normal installation since the proper slope is
designed into the product. However, be sure
you have approximately a I/Z bubble (6.4 mm
[%“I) downward tilt to the outside for proper
water drainage. If necessary, reposition or
shim cabinet to provide the proper tilt or side-
to-side leveling. Now, tighten all 4 filler board
screws. Be sure cabinet bottom flange is
against rear of window sill for proper seal.
Finally, make 2 pilot holes (2.4 mm [XC]) into
the window sill, using the holes in the cabinet
as a guide. Use 2 wood screws to secure the
bottom of the cabinet to the window sill.
continued on next page