Toshiba RAV-SP300AT2-UL Air Conditioner User Manual


 
– 91 –
No.
Part name
Exchange of
electric parts
(Continued)
Procedure
1. Reactor
1) Perform work of Detachment 1 of
,
and
.
2) Remove the relay connector connected to
the control P.C. board.
3) Cut off the bundling band binding the
compressor lead and the relay connector.
4) Remove each reactor.
(Truss B tight screw M4, 6 mm, 2 pcs. each)
5) Attach a new reactor.
NOTE:
Be sure to bind the removed bundling band with
the bundling band on the market.
Be careful that the fan motor lead does not come
to contact with the reactor body.
Remarks
Reactor relay connector
(Connected to lead wire
(White) at P.C. board side)
Reactor relay connector
(Connected to lead wire
(Charcoal gray) at P.C. board side)
Bundling band
(Compressor lead, reactor lead)
Fan motor lead
Fan motor lead
Fan motor lead
Upper reactor
Connected to reactor relay connector
(Connected to lead wire (White)
at P.C. board side)
Bundling band
Lower reactor
Connected to reactor relay connector
(Connected to lead wire (Charcoal gray)
at P.C. board side)