Sterling Plumbing 882.00254.00 Heat Pump User Manual


 
7/50D Plus or 7/50D Controller Chapter 3: Installation 36
Setting Up the System
Setting the Number of Stations and the Number of Pumps
At the Station Summary screen (shown above), or at the Pump Summary screen:
1. Touch the icon for any station (or pump) and hold it for several seconds. (When the
controller arrives from the factory, only one icon appears.)
A Station n Operator screen similar to the following appears. (If you started at the
Pump Summary screen, the Pump n Setup screen appears instead.)