ProduCt SPeCifiCationS
ProduCt SPeCifiCationS
SS-CPH90-150 www.goodmanmfg.com 27
roof CurB inStallation (Cont.)
Curb installations must comply with local codes and should follow the
establishedguidelinesoftheNationalRoongContractorsAssociation.
Properunitinstallationrequiresthattheroofcurbbermlyandpermanently
attachedtotheroofstructure.Checkforadequatefasteningmethodpriorto
settingtheunitonthecurb.
Full perimeter roof curbs are available from the factory and are shipped
unassembled. The installing contractor is responsible for eld assembly,
squaring,leveling,andmountingontheroofstructure.Allrequiredhardware
necessaryfortheassemblyofthesheetmetalcurbisincludedinthecurb
accessorypackage.
• Determinesucientstructuralsupportbeforelocatingandmountingthe
curbandpackageunit.
• Duct-workmustbeconstructedusingindustryguidelines.Theduct-work
mustbeplacedintotheroofcurbbeforemountingthepackageunit.Our
fullperimetercurbsincludeductconnectionframestobeassembledwith
thecurb.Cantilevered-typecurbsarenotavailablefromthefactory.
• Contractor furnishes curb insulation, cant strips,
ashing,andgeneralroongmaterial.
• Supportcurbsonparallelsideswithroofmembers.
Topreventdamagetotheunit,theroofmembers
cannotpenetratesupplyandreturnductopenings.
Note:Theunitandcurbaccessoriesaredesignedto
allowverticalductinstallationbeforeunitplacement.
Duct installation after unit placement is not
recommended.
See the manual shipped with the roof curb for
assemblyandinstallationinstructions.
toP View
3-d View
15 x 31⅛
Supply Opening
14⅛ x 38
Return Opening
92¼
53¼
14
1⅜
¾
14
1⅜
Power and low-Voltage BloCk loCationS


