Enviro 50-1040 Stove User Manual


 
Installation
MODEL 1200 BRICK PLACEMENT & TUBE LOCATIONS:
COMPLETE THE STOVE AND SMOKE PIPE INSTALLATION BEFORE PLACING THESE BRICKS.
When replacing bricks, use only pumas type re bricks.
TOTAL BRICKS:
11 - Full size bricks 9” long x 4.5” wide x 1.25” thick
(22.9 cm long x 11.4 cm wide x 3.2 cm thick)
2 - Partial bricks 9” long x 3” wide x 1.25” thick
(22.9 cm long x 7.6 cm wide 3.2 cm thick)
1 - Half brick 4.5 “ long x 4.5” wide x 1.25” thick
(11.43 cm long x 11.43 cm wide x 3.175 cm thick)
Removing Air Tube: If a secondary air tube needs to be removed, place a screwdriver (any style except
at head) into one of the air holes and tap it with a hammer/mallet to the left until the right end of the
tube is freed. To installation a secondary air tube reverse the above instructions.
IMPORTANT: All secondary air tubes must be in place for proper operation.
P
a
r
ti
a
l
B
r
i
c
k
H
a
l
f
B
r
i
c
k
F
u
ll
S
i
z
e
B
r
i
c
k
Tube A
Tube E
Tube D
Figure 42: Brick Placement for 1200 shown with Secondary Air Channel
and Tubes.
35
1. Place the three (3) full size
bricks along each side of the
rebox and one (1) full size
brick on either side of the back
of the rebox.
2. To place the oor bricks, lay
the two (2) partial bricks along
the back of the oor. Then on
the left, lay two (2) full size
bricks and on the right, lay a
full size brick in the center and
the half brick in the front (for
the ash dump). The spaces
between the bricks will soon
ll with ashes.