Carrier MPE62L-10R Heating System User Manual


 
III. PRELIMINARY CHECKLIST ITEMS (cont)
CHANGES TO DEFAULT VALUES
RECORD ALL CHANGES MADE TO FACTORY DEFAULT VALUES
IV. START-UP
CHECK EVAPORATOR FAN SPEED AND RECORD.
CHECK CONDENSER FAN SPEED AND RECORD.
AFTER AT LEAST 10 MINUTES RUNNING TIME, RECORD THE FOLLOWING MEASUREMENTS:
COMP A1 COMP A2 COMP B1 COMP B2
OIL PRESSURE
SUCTION PRESSURE
SUCTION LINE TEMP
DISCHARGE PRESSURE
DISCHARGE LINE TEMP
ENTERING CONDENSER AIR TEMP
LEAVING CONDENSER AIR TEMP
EVAP ENTERING AIR DB TEMP
EVAP ENTERING AIR WB TEMP
EVAP LEAVING AIR DB TEMP
EVAP LEAVING AIR WB TEMP
COMPRESSOR AMPS (L1)
COMPRESSOR AMPS (L2)
COMPRESSOR AMPS (L3)
ELECTRICAL
SUPPLY FAN AMPS
EXHAUST FAN AMPS
ELECTRIC HEAT AMPS L1 L2 L3
TEMPERATURES
OUTDOOR-AIR TEMPERATURE
F DB (Dry-Bulb)
RETURN-AIR TEMPERATURE
FDB F WB (Wet-Bulb)
COOLING SUPPLY AIR
F
PRESSURES
GAS INLET PRESSURE
IN. WG
GAS MANIFOLD PRESSURE STAGE NO. 1
IN. WG STAGE NO. 2 IN. WG
REFRIGERANT SUCTION CIRCUIT NO. 1
PSIG CIRCUIT NO. 2 PSIG
REFRIGERANT DISCHARGE CIRCUIT NO. 1
PSIG CIRCUIT NO. 2 PSIG
VERIFY REFRIGERANT CHARGE USING CHARGING CHARTS ON PAGES 48 AND 49
GENERAL
ECONOMIZER MINIMUM VENT AND CHANGEOVER SETTINGS TO JOB REQUIREMENTS
CHECK THE COMPRESSOR OIL LEVEL SIGHT GLASSES; ARE THE SIGHT GLASSES SHOWING
OIL LEVEL PER INSTRUCTIONS ON PAGE 29. (Y/N)
PERFORM CONTROL CONFIGURATION PROCEDURE ON PAGES CL-3 AND CL-4.
CL-2