Wayne-Dalton 5120 Garage Door Opener User Manual


 
Tools Needed:
14
Tools Needed:
Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer.
To find your Wayne-Dalton dealer; refer to your local yellow pages / business listings or go to Find a dealer area online at www.wayne-dalton.com
Vertical Track
IMPORTANT: THE TOPS OF THE
VERTICAL TRACKS MUST BE LEVEL
FROM SIDE TO SIDE. IF THE BOTTOM
SECTION WAS SHIMMED TO LEVEL IT.
THE VERTICAL TRACK ON THE SHIMMED
SIDE, MUST BE RAISED THE HEIGHT OF
THE SHIM.
Position the left hand vertical track
assembly over the rollers of the bottom
section. Make sure the counterbalance
cable is located between the rollers
and the door jamb. Drill 3/16” pilot
holes for the lag screws. Loosely fasten
jamb brackets and flagangle to the
jamb using 5/16” x 1-5/8” lag screws.
Tighten lag screw securing bottom
jamb bracket to jamb, to maintain
5/8” spacing. Hang cable drum over
flagangle. Repeat for the right hand
side.
BOTTOM SECTION
BOTTOM SECTION
VERTICAL TRACK
ROLLER
5/16” X 1-5/8”
LAG SCREWS
FLAGANGLE
VERTICAL
TRACK
ASSEMBLY
CABLE
JAMB
BRACKET
3/16” Drill Bit
Power Drill
7/16” Socket
Driver
Tape Measure
Level
5/8”
Stacking Sections
NOTE: For door section identification see
page 4.
NOTE: Make sure hinge leafs are flipped
down, when stacking another section
on top.
Place rollers in hinge tubes of the
second section (lock section). With
assistance, lift second section and guide
rollers into the vertical tracks. Keep
sections aligned and fasten hinges to
connect the sections using 1/4”-14 x
5/8” self tapping screws. Repeat for
other section(s) except top section.
IMPORTANT: PUSH & HOLD THE HINGE
LEAFS AGAINST SECTION WHILE
SECURING WITH 1/4”-14 X 5/8” SELF
TAPPING SCREWS. END HINGES HAVE
(2) SCREWS AND INTERMEDIATE HINGES
HAVE (3) SCREWS.
NOTE: Install lock at this time (sold
separately) see instructions in OPTIONAL
SIDE LOCK INSTALLATION on page 31.
LOCK SECTION
6
7
(2) 1/4”-14 X 5/8”
SELF TAPPING SCREWS
END HINGES (LEFT HAND SHOWN, RIGHT
HINGE SYMMETRICALLY OPPOSITE)
INTERMEDIATE HINGES
Power Drill
7/16” Socket
Driver
12R QI FLAGANGLE
(3) 1/4”-14 X 5/8” SELF TAPPING
SCREWS
LAG
SCREW
LOCATIONS
LAG
SCREW
QUICK INSTALL
JAMB BRACKET
CABLE DRUM