Wayne-Dalton 5120 Garage Door Opener User Manual


 
11
Tools Needed:
Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer.
To find your Wayne-Dalton dealer; refer to your local yellow pages / business listings or go to Find a dealer area online at www.wayne-dalton.com
Installation
IMPORTANT: READ INSTRUCTIONS TITLED “P4” “REMOVING THE OLD DOOR” ON PAGE 9 AND “P5” “PREPARING THE OPENING” ON
PAGE 10 BEFORE ATTEMPTING DOOR INSTALLATION.
IMPORTANT: STAINLESS STEEL OR PT2000 COATED LAG SCREWS MUST BE USED WHEN INSTALLING CENTER BEARING BRACKETS,
END BRACKETS, JAMB BRACKETS, OPERATOR MOUNTING/SUPPORT BRACKETS AND DISCONNECT BRACKETS ON TREATED LUMBER
(PRESERVATIVE-TREATED). STAINLESS STEEL LAG SCREWS ARE NOT NECESSARY WHEN INSTALLING PRODUCTS ON UN-TREATED
LUMBER.
NOTE: It is recommended that 5/16” x 1-5/8” lag screws be pilot drilled using a 3/16” drill bit, and 1/4” x 2” lag screws and
1/4” x 1-1/2” lag screws be pilot drilled using a 1/8” drill bit, prior to fastening.
INSTALLATION
None
Attaching Quick Install Flag
Angle to Vertical Track
NOTE: If you have riveted track, skip this
step.
Place the lower quick install tab of the
flagangle in the quick install feature of
the vertical track. Give the flagangle 1/4
turn to lock in place. Repeat for other
side.
QUICK INSTALL TAB UNLOCKED QUICK INSTALL TAB LOCKED
FLAGANGLE
VERTICAL
TRACK
1
LEFT HAND TRACK AND FLAGANGLE
RIGHT HAND TRACK AND FLAGANGLE
FLAGANGLE
VERTICAL
TRACK