Toshiba RAM-SM560KRT-E Air Conditioner User Manual


 
67
3
INSTALLATION OF INDOOR UNIT
WARNING
Install the air conditioner certainly at a place to sufficiently withstand the weight.
If the strength is insufficient, the unit may fall down resulting in human injury.
Perform a specified installation work to guard against an earthquake.
An incomplete installation can cause accidents by the units falling and dropping.
Installation procedure
1. Lay drain pipes, refrigerant pipes, and connecting cables behind wall
or ceiling concurrently with supply/drain water work and piping work.
2. Install the mounting frames of supply/return air panels
3. Position the refrigerant and drain pipes
5. Connect cables and pipes
4. Install the indoor unit
• Preparation for installation • Setting/fixing of indoor unit
6. Install supply/return air panels
7. Mount thermal insulation
8. Mount check port