Regency G36D-NG NATURAL GAS Indoor Fireplace User Manual


 
UltraGlow G36D Zero Clearance Direct Vent Gas Fireplace 11
VENTING
UltraGlow Direct Vent System (Flex)
Horizontal Terminations Only
These venting systems, in combination with the G36D Direct Vent Gas Fireplace, have been tested and listed as a direct vent heater system by
Warnock Hersey. The location of the termination cap must conform to the requirements in the Vent Terminal Locations diagram on page 10.
UltraGlow Direct Vent (Flex) System Termination Kit (Part # 946-515) includes all the parts needed to install the G36D with a maximum
total run of 4 feet.
1) 6-7/8" dia. fl exible liner (4 ft. length)
2) 4" dia. fl exible liner (4 ft. length)
3) spring spacers (4)
4) thimble (2)
5) AstroCap termination cap (1)
6) screws (12)
7) tube of Mill Pac (1)
8) plated screws (8)
9) screws #8 x 1-1/2" Drill Point, Stainless Steel (4)
INSTALLATION
Notes:
1) Liner sections should be continuous without any joints or seams.
2) Only Flex pipe purchased from Regency may be used for Flex installations.