5100-I ACT WOOD INSERT
April 21, 2010
R
438-0380E
H. Bafe Removal
• Frequency: As needed
• By:
• Task:
embers before disposal into a metal container.
tube retainer bolts on the air channel under the end of
oil for at least 15 minutes before trying to remove them.
Figure 36.1.
channel and out of hole at the other end. It is necessary
NOTE
be sure the tube with the larger holes is placed in the
front for your insert to operate properly.
straight out through door. Figure 36.2.
Ceramic Blanket
Baffle
Allen wrench
on retainer bolt
First tube has larger holes
Figure 36.1
Figure 36.2