10-10
Page 26
2008-12-03
Figure 7. Mounting Process – Step 7
The air gap between the outermost vertical supports and the duct walls as well as between the
front bracket and the duct ceiling must be sealed using EPDM sealing profile (accessory). Cut the EPDM
sealing profiles to the desired length (channel height and channel width plus cm allowance). Fix the
EPDM sealing profiles to the outermost vertical supports and to the front bracket using the clamping
brackets and self-tapping screws #10 x 3/4" supplied. Tailor the EPDM sealing profiles to the duct height
and the duct width, then fix them to the duct walls and the duct ceiling using the clamping brackets and
self-tapping screws #10 x 3/4" supplied (number of self-tapping screws to be used as required).
Note: In place of the EPDM sealing profiles also sheet metal angles of stainless steel (not included
in the delivery) may be used for the sealing.