10-00
Page 10
2008-12-03
3.5 MHTC Flow Model
3.5.1. MHTC Flow Construction Model
1
Water connection on unit R 3/4 " (outside thread)
2
Volume controlling valves (adjustable manually)
3
Step valves (1 to 3)
4
Water tub
5
Open drain (outside diameter 1.5" PVC (1.66" (42 mm) OD)
6
Water hoses
7
Spray bar cap with distribution pipes
8
Humidification boxes
9
Mist eliminator (for air speed above humidification boxes >750 fpm) (3.8 m/s)
10
UV water treatment (option)
11
MHTC Total Control Unit
Figure 3. Construction Model – MHTC Flow