10-10
Page 23
2008-12-03
Figure 4. Mounting Process – Step 4
Carefully mount the vertical intermediate support(s) “F” (number depending on the unit size)
onto the threaded bolts of the water tub, then fix each support with two 1/4 UNC nuts and washers
to the water tub (do not overtighten the nuts) and with a hexagon socket screw 1/4 UNC x 1/2" and a
washer to the cross beam.
Important! Before tightening the nuts make sure the holes of the intermediate support seat solidly on the
sheet metal of the water tub and do not stick on the collar of the threaded bolt!