Haier ESA412K Air Conditioner User Manual


 
Preparation for the installtion
(1) Position of ceiling opening between unit and suspending bolt.
3
(2) Cut an opening in ceiling for installation if necessary. (when ceiling already exists.)
(3) Install a suspending bolt.
(Use a M10 bolt)
To support the unit weight, anchor bolt shall be used in the case of already exists ceiling. For new
ceiling, use built-in type bolt or parts prepared in the field.
Before going on installing adjust space between ceiling.
<Installation example>
Note: All the above mentioned parts shall be prepared in field.
Ceiling
50~100
Roof
Anchor bolt
Long nut
Suspending bolt
Refer to paper pattern for dimension of ceiling hole.
Connect all pipings (refrigerant, water drainage), wirings (inter unit cable) to indoor unit, before installation.
Cut a hole in ceiling, may be a frame should be used to ensure a smooth surface and to prevent vibration.
Contact your real estate dealer
(For series 182)
(160)
Suspending bracket
Ceiling
A
950(Ornament
890(Ceiling
840(Indoor
78
(Distance between suspending
(Distance between suspending
A
950(Ornament
890(Ceiling
840(Indoor
Suspending
1280(Ceiling opening)
(Distance between suspending
127
51
51
(Distance between suspending
860(Ceiling
78
Distance between
suspending bolts 535mm
Indoor unit 570mm
Ceiling opening 650mm
Ornament panel 700mm
Indoor unit 570mm
Ceiling opening 650mm
Ornament panel 700mm
Overlap between ceiling and
ornament panel shall be 25mm
Suspending bolts
Ceiling
Ornament panel
150mm
320mm
60mm
>a__WcU[S^ <[c >a`V[e[a`Wc
and AB362ACEAA)
and AB362ACERA
For series 482,602
-66-