www.desatech.com
112108-01C 5
DIMENSIONS
FRONT VIEW
30"
(Opening)
25"
19
7
/
8
"
(Opening)
RIGHT SIDE
1
7
/
8
"
22
5
/
8
"
41
1
/
8
"
32"(Opening)
1
7
/
8
"
39
3
/
4
"
26
3
/
8
"
3"
1"
3
1
/
2
"
22
5
/
8
"
34
3
/
4
"
3"
BACK VIEWTOP VIEW
(Left Side)
(Right Side)
(Front)
(Back)
24"
10
1
/
2
"
1
1
/
2
"ø 1
1
/
2
"ø
10
1
/
2
"
11
15
/
16
"
PRE-INSTALLATION
PREPARATION
REQUIREMENTS
Determine the safest and most efcient location
for your DESA direct-vent replace. Make sure
that rafters and wall studs are not in the way of the
venting system. Choose a location where the heat
output is not affected by drafts, air conditioning
ducts, windows or doors. Be aware of all restric-
tions and precautions before deciding the exact
location for your replace and termination cap.
When deciding the location of your replace,
follow these rules:
• A projection may be ideal for a new addition
on an existing nished wall. Refer to horizontal
termination congurations on page 13 or verti-
cal congurations on page 15.
• Do not connect this replace venting to a chim-
ney ue serving a separate solid-fuel burning
replace or appliance.
• Due to high temperatures, do not locate this
replace in high trafc areas, windy or drafty
areas or near furniture or draperies.
• Never obstruct the front opening of the appli-
ance or ow of combustion and ventilation air.
Keep control compartments accessible.
• Do not locate close to where gasoline or other
ammable liquids may be stored. The appliance
must be kept clear and free from combustible
materials.
Figure 1 - Dimensions for Left/Right Side Corner Unit
Figure 2 - Direct-Vent Fireplace
Log Set
Upper
Louver
Panel
Lower
Louver
Panel