Bosch Appliances 12/18 Boiler User Manual


 
31
FINISHING COMMISSIONING -
APPLIANCE
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389b (09/07)
36
COMMISSIONING
FINISHING COMMISSIONING -
APPLIANCE
1Refit the top panel and press down to
compress the seal when fitting the
securing screws (A).
2Push the front panel up behind the top
panel and push in at the base to secure
the screws (B) with the tool provided.
Always apply pressure at the edges of the
panels when securing to avoid accidental
damage.
Handover:
Complete the guarantee registration card,
combustion record (page 49) and a CD11 or
an equivalent commissioning form.
Set up the controls and show the user how
to operate all the controls shown in the User
Guide, and all system controls.
Where applicable, instruct the customer how
to repressurise the system.
If the appliance is unused and exposed to
freezing conditions, shut off all the mains
supplies and drain the system and boiler to
prevent damage to the system and boiler.
NOTE: Release drain point (K) to drain the
secondary heat exchanger.
K
A
A
B
B
C
2
1