Optional Equipment (for qualified installers only) 45
© Travis Industries 4040830 100-01143
LP Conversion Instructions
Install the conversion kit prior to installing the gas line to ensure proper gas use.
1 Remove the glass (see page 28). Remove the logs and coals (if installed - page 30)
2 Remove the burner (see illustration below).
The mixing tube slides onto
the orifice.
Burner Replacement:
Lift up on the left
side of the burner,
then slide the
burner to the left
and up to remove.
Make sure the screw
on the bottom of the
burner inserts into this
hole.
Before replacing the burner,
slide the air control all the
way to the right.
Lift the pilot hood off
the pilot assembly (you
may need to pull hard
to remove).
b
a
After replacing the burner
re-attach the pilot hood.
Make sure the burner is fully seated and pilot hood lines up with the
burner holes at the rear edge of theburner.