Avalon Stoves 21 DV Fireplace Indoor Fireplace User Manual


 
20 Installation (for qualified installers only)
© Travis Industries 4040830 100-01143
Termination Requirements
NOTE: Measure all clearances from the nearest edge of the exhaust hood.
A Minimum 9" clearance from any door or window
B Minimum 12" above any grade, veranda, porch, deck or balcony
C Minimum 3-3/8" from outside corner walls
D Minimum 0" from inside corner walls
E Minimum 11" clearance below unventilated soffits or roof surfaces
Minimum 18" clearance below ventilated soffits
Minimum 6" clearance from roof eaves
NOTE: Vinyl surfaces require 24"
11 Min.
6 Min.
Roof
Surface
Roof
Eaves
F Minimum 18" clearance below a veranda, porch, deck or balcony (must have two open
sides)
G Minimum 48" clearance from any adjacent building
H Minimum 84" clearance above any grade when adjacent to public walkways or driveways
NOTE: may not be used over a walkway or driveway shared by an adjacent building
I Minimum 48" clearance from any mechanical air supply inlet
J Minimum 36" clearance above and 48” below and to the sides of non-mechanical air
supply inlet
K Minimum 36" from the area above the meter/regulator (vent outlet)
L Minimum 36" from the meter/regulator (vent outlet)
M Minimum 12” above the roof line (for vertical terminations)
N Minimum 24” horizontal clearance to any surface (such as an exterior wall) – for vertical
terminations
C
B
H
E
G
A
D
F
L
K
J
I
NOTE: Measure clearances to the nearest edge of the exhaust hood.
A
E
E
M
N
Use the vinyl siding standoff (#950) when installing on an exterior with vinyl siding.
Vent termination must not be located where it will become plugged by snow or other material.
Venting termination shall not be recessed into a wall or siding.
These clearances meet UMC-1994 code standards.