APC ACPA4000 Air Conditioner User Manual


 
15NetworkAIR ACPA4000
Start-Up
Start-up checklist
Before starting the equipment, check to see that the following conditions are met:
All electrical connections comply with national and local codes and safety standards.
All accessories and ductwork have been installed.
Air flow to and from the equipment is not blocked.
The condensate drain is connected and not kinked or pinched.
How to apply power to the equipment
Insert the IEC-320-C19 connector of the power
cord into the back of the equipment. Insert the
opposite end of the power cord, a NEMA 5-20
plug, into the wall outlet. Verify the circuit
breaker is pressed in (flush with the rear of the
equipment), and the green LED on the back of
the plug is on.
Warning: Route the power cord and the condensate line to prevent accidental injury to
people or damage to the equipment.
Circuit breaker
Electrical Hazard: Do not use
extension cords with this
equipment. Using an extention cord
reduces circuit protection and voids
the warranty.
Note: If the equipment has been
unplugged or off for less than three
minutes, it waits three minutes before
starting the compressor.