Allied Air Enterprises A93UH Furnace User Manual


 
506501-01 Page 15 of 48Issue 1031
Joint Cementing Procedure
All cementing of joints should be done according to the
specifications outlined in ASTM D 2855.
1. Measure and cut vent pipe to desired length.
2. Debur and chamfer end of pipe, removing any ridges or
rough edges. If end is not chamfered, edge of pipe
may remove cement from fitting socket and result in a
leaking joint.
3. Clean and dry surfaces to be joined.
4. Test fit joint and mark depth of fitting on outside of pipe.
5. Uniformly apply a liberal coat of PVCD primer for PVC
or use a clean dry cloth for ABS to clean inside socket
surface of fitting and male end of pipe to depth of fitting
socket.
NOTE: Time is critical at this stage. Do not allow primer to
dry before applying cement.
DANGER OF EXPLOSION!
Fumes from PVC glue may ignite during system check.
Allow fumes to dissipate for at least 5 minutes before
placing unit into operation.
DANGER
OUTDOOR TERMINATION KITS USAGE
Table 3