Wayne-Dalton 341785 Garage Door Opener User Manual


 
Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer.
To find your Wayne-Dalton dealer; refer to your local yellow pages / business listings or go to Find a dealer area online at www.wayne-dalton.com
18
Tools Needed:
Top Section
Place the top section in the opening
and vertically align with lower sections.
Align vertical marks in the upper
alignment sticker, with the lower
alignment sticker on right hand side on
the back of door.
Temporarily secure the top section by
driving a nail in the header near the
center of the door and bending it over
the top section.
Now flip up hinge leafs, hold tight
against section, and fasten center
hinges first, and end hinges last. (Refer
to Step 8).
Position flagangle between 1-11/16”
(43 mm) to 1-3/4” (44 mm) from the
edge of the door. Tighten the bottom lag
screw. Flagangles must be parallel to
the door sections. Repeat for opposite
side.
IMPORTANT: THE DIMENSION
BETWEEN THE FLAGANGLES MUST BE
DOORWIDTH PLUS 3-3/8” (86MM) TO
3-1/2” (89 MM) FOR SMOOTH, SAFE
DOOR OPERATION.
For quick install track:
Complete the vertical track installation
by securing the center jamb bracket(s)
and tightening the other lag screws.
Repeat for opposite side.
For fully adjustable track:
Complete the vertical track installation
by securing the center jamb bracket(s)
and tightening the other lag screws.
Push the vertical track against the
rollers so that the rollers are touching
the deepest part of the curved side
of the track (see illustration). Tighten
all track bolts and nuts. Repeat for
opposite side.
10
Hammer
7/16” Socket
7/16” Wrench
Ratchet Wrench
7/16” Socket
Driver
Power Drill
DOOR WIDTH
+3-3/8” TO 3-1/2”
1-11/16” TO 1-3/4”
FLAGANGLE
TOP
SECTION
NAIL
ROLLER
VERTICAL TRACK
ROLLER AGAINST
VERTICAL TRACK
TOP SECTION
FULLY ADJUSTABLE TRACK
CORRECT
INCORRECT
TOP
SECTION
TOP
SECTION
327985 NEW 9-04-06
327985 NEW 9-04-06
ALIGNMENT STICKERS