Wayne-Dalton 341785 Garage Door Opener User Manual


 
Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer.
To find your Wayne-Dalton dealer; refer to your local yellow pages / business listings or go to Find a dealer area online at www.wayne-dalton.com
15
Tools Needed:
Tools Needed:
INSTALLATION
Bottom Section
Before installing the bottom section,
the weather seal (may not be included)
must be installed (see PREPARING THE
OPENING on page 10)
Center the bottom section in the door
opening. Level section using wooden
shims (if necessary) under the bottom
astragal.
Level
6
BOTTOM
SECTION
DOOR OPENING
WEATHER SEAL
WOODEN SHIMS
(IF NECESSARY)
LEVEL
Vertical Track
IMPORTANT: THE TOPS OF THE
VERTICAL TRACKS MUST BE LEVEL
FROM SIDE TO SIDE. IF THE BOTTOM
SECTION WAS SHIMMED TO LEVEL IT.
THE VERTICAL TRACK ON THE SHIMMED
SIDE, MUST BE RAISED THE HEIGHT OF
THE SHIM.
Position the left hand vertical track
assembly over the rollers of the bottom
section. Make sure the counterbalance
cable is located between the rollers and
the door jamb. Drill 3/16” pilot holes
for the lag screws. Loosely fasten
jamb brackets and flagangles to the
jamb using 5/16” x 1-5/8” lag screws.
Tighten lag screw securing bottom
jamb bracket to jamb, to maintain 5/8”
spacing. Repeat for the right side.
BOTTOM
SECTION
BOTTOM SECTION
VERITCAL TRACK
ROLLER
5/16” X 1-5/8”
LAG SCREWS
FLAGANGLE
VERTICAL
TRACK
ASSEMBLY
JAMB
BRACKET
3/16” Drill Bit
Power Drill
7/16” Socket
Driver
Tape Measure
Level
5/8”
7
QUICK INSTALL AND FULLY ADJUSTABLE
FLAGANGLE LAG LOCATIONS
LAG
SCREW
LOCATIONS
LAG
SCREW
QUICK INSTALL
JAMB BRACKET