Wagner SprayTech Zzb012eng Septic System User Manual


 
21
ZIP52 FINISHING - PF .
OPERATING MANUAL
EDITION 01 /2010
PART NO. ZZB012ENG
5 STARTING UP AND OPERATING
5.1 INSTALLATION AND CONNECTION
7!2.).'
)NCLINEDSURFACE
2ISKOFACCIDENTSIFTHEUNITROLLSAWAYFALLS
0OSITIONTHECARRIAGEWITHTHEPISTONPUMPHORIZONTALLY
)FTHESURFACEISINCLINEDPOSITIONTHEFEETOFTHECARRIAGETOWARDS
THEGRADIENT
3ECURETHECARRIAGE
3)()??'"
5.1.1 PUMP INSTALLATION
Note
The pneumatic motor must be supplied with clean
industrial air; make sure effi cient fi ltering and con-
densate separation systems are installed on the air
line. All impurities and the eventual condensate that
has built up inside the air fi lter on top of the pump
must be drained daily.
NOTE: Consult specifi c catalogues when choosing
the pipes. The driving air pipe must be properly di-
mensioned.
Procedure for 2301832, 2301836, 2301837 :
1. Mount the pump onto a basement
2. Connect the air atomization and paint delivery
hoses, respectively, to the corresponding
attachments (C: air - N: paint), carefully
tightening the fi ttings.
Procedure for 2301838 :
1. Connect the air to the pump in the (H) fi tting,
installing an on-off valve on the line to stop the
feeding air in case of emergency.
2. Connect the spraying air to its fi tting (E). Carry
out the same operation for the paint delivery
pipe, to be connected to its fi tting (I).