Trane Modu Heating System User Manual


 
SCXG-SVX01B-EN 13
Pre-Installation
Considerations
Rigging and Handling
Unit Shipping
1. Position rigging sling under wood
shipping skid.
2. Use spreader bars to avoid unit
damage.
3. When using a forklift, exercise caution
to prevent unit damage.
4. Use the standard fork length to lift one
end and drag or pull unit while skidding
the opposite end.
5. The unit center of gravity will fall within
center of gravity block at various
locations depending on unit options.
6. Use hooks to lift fan section only. Do not
hook into open channels to lift unit.
7. See unit nameplate for unit weight.
8. Do not stack units.
Do not use hooks to lift unit or
hook into open channels to lift
unit. This could cause unit
damage.
Installation
ƽƽ
ƽƽ
ƽ
CAUTION
!
Figure I-PC-8. Split-apart modular unit proper rigging.
Figure I-PC-7. Assembled modular unit proper rigging.
Fan Section