139
Toshiba
4 Electric parts
replacement
2.Reactor
1)Perform the step 1-1.
2)Remove the relay connector connected to the
control board.
3)Cut the binding tie that binds the compressor leads
and relay connectors.
4)Remove the reactor.
(Truss B tight screw Ø4 × 6, 2 screws)
5)Attach a new reactor.
Note)
Be sure to bind the removed binding tie by using
the commercially available binding tie.
Make sure that the fan motor lead and the reactor
body do not contact each other.
No.
Exchange parts
name
Work procedure Remarks
Relay connector
Reactor body
Fan motor lead
Control board
Binding tie
(Compressor lead, Relay connector)
+00A09-002_01EN_SVM_ALL_Air_to_Water.book Page 139 Monday, October 5, 2009 2:09 PM