113
Toshiba
6-2. How to start and cancel schedule operation
<Operation start>
Without schedule operation set, press the remote controller SCHEDULE button. blinks.
Pressing the SET button during the 5-second blinking changes to lit, and the schedule operation starts.
<Operation cancel>
With schedule operation set, press the remote controller SCHEDULE button. blinks.
Pressing the CL button during the 5-second blinking causes to put out, and the schedule operation is
cancelled.
7. Frost Protection Setting
This setting keeps a room with weak heating when users are not home for long hours.
1 Press the ZONE1,2 button to start a heating operation.
(This is available only for a normal heating operation.)
(No frost protection setting is provided to hot water supply and cooling.)
2 Pressing the FORST PROTECTION button displays the
symbol and "F" for temperature setting. (See display )
The heating operation of 15°C is set.In FC_3B in 2-2 section, the set
temperature can be changed in the range of 10 to 55°C.
3 Pressing the FORST PROTECTION button makes
disappear, and the set temperature returns to the normal heating
temperature. (Pressing the ZONE1,2 button ends both
the frost protection and the heating operation.)
2,3 1,3
+00A09-002_01EN_SVM_ALL_Air_to_Water.book Page 113 Monday, October 5, 2009 2:09 PM