Slant/Fin J-390 Boiler User Manual


 
Jaguar Model J-390
6
For both direct and non-direct installation, the following must be
considered:
-
Openings must never be reduced or closed. If doors or win-
dows are used for air supply, they must be locked open.
- Protect against closure of openings by snow and debris.
Inspect frequently.
-
No mechanical draft exhaust or supply fans are to be
u
sed in or near the boiler area.
- Boiler area must never be under negative pressure. The
flow of combustion and ventilating air to the boiler must
not be obstructed.
F
LUE GAS VENTING REQUIREMENTS
The Jaguar J-390 series boiler is a high efficiency, mechanical-
ly forced draft boiler and, therefore, require different venting
arrangements than natural draft, lower efficiency boilers.
THE FOLLOWING INSTRUCTIONS MUST BE CAREFULLY
READ AND FOLLOWED IN ORDER TO AVOID ANY HAZ-
ARDOUS CONDITIONS DUE TO IMPROPER INSTALLATION
OF THE AIR INTAKE AND FLUE GAS VENTING SYSTEM.
The v
ent piping installation MUST be in accordance with these
instructions and with ANSI Z223.1-latest edition NATIONAL
FUEL GAS CODE, Part 7, Venting of Equipment. Other local
codes may also apply and must be followed. Where there is a
conflict between these requirements, the more stringent case
shall apply.
The use of a vent damper is NOT permitted on this boiler series.
ADDITIONAL REQUIREMENTS FOR THE COMMONWEALTH
OF MASSA
CHUSETTS
When the Bobcat is installed and used in the Commonwealth of Massa-
chusetts, the following additional
requirements pursuant to Massachusetts
code 248 CMR MUST be met:
(1). Exisiting chimneys shall be permitted to have their use continued
when a gas conversion burner is installed, and shall be equipped with a
manual reset device that will automatically shut off gas to the burner in the
event of a sustained back-draft.
(2)(a). For all side wall horizontally vented gas fueld equipment installed in
every dwelling, building or structure used in whole or part for residential
purposes, including those owned or operated by the Commonwealth and
where the side wall exhaust vent termination is less than seven (7) feet
above finsihed grade in the area of the venting, including but not limited to
dec
ks and porches
, the following requirements shall be satisfied:
1. INSTALLATION OF CARBON MONOXIDE DETECTORS. At the time
of installation of the side wall horizontal vented fueled equipment, the
installing plumber or gasfitter shall observe that a hard wired carbon
monoxide detector with an alarm and battery back-up is installed on the
floor level where the gas equipment is to be installed. In addition, the
installing plumber or gasfitter shall obser
v
e that a battery operated or hard
wired carbon mono
xide detector with an alar
m is installed on each addi
-
tional level of the dwelling, building or structure served by the side wall
horizontal vented gas fueled equipment. It shall be the responsibility of the
proper
ty o
wner to secure the ser
vices of qualified licensed prof
essionals
for the installation of hard wired carbon monoxide detectors.
a.
In the e
v
ent that the side wall horizontally vented gas fueld equipment
is installed in a crawl space or an attic, the hard wired carbon monoxide
detector with alarm and battery back up may be installed on the next adja-
cent floor level.
b
.
In th e
v
ent that the requirements of this subdivision can not be met at
the time of completion of installation, the owner shall have a period of thir-
ty (30) days to comply with the above requirements; provided, however,
that during said thirty (30) day period, a battery operated carbon monoxide
detector with an alarm shall be installed.
2. APPROVED CARBON MONOXIDE DETECTORS. Each carbon
monoxide detector as required in accordance with the above provisions
shall comply with NFPA 720 and be ANSI/UL 2034 listed and IAS certified.
3. SIGNAGE. A metal or plastic identification plate shall be permanently
mounted to the exterior of the building at a minimum height of eight (8)
feet above grade directly in line with the exhaust vent terminal for the hori-
zontally vented gas fueled heating appliance or equipment. The sign shall
read, in print size no less that one-half (1/2) inch in size,
“GAS VENT
DIRECTLY BELOW, KEEP CLEAR OF ALL OBSTRUCTIONS”.
4. INSPECTION. The state or local gas inspector of the side wall horizon-
tally vented gas fueled equipment shall not approve the installation unless,
upon inspection, the inspector observes carbon monoxide detectors and
signage installed in accordance with the provisions of 248 CMR
5.08(2)(a)1 through 4.
(b) EXEMPTIONS. The following equipment is exempt from 248 CMR
5.08(2)(a)1 through 4:
1.
The equipment listed in Chapter 10 entitled “Equipment Not
Required TO Be Vented” in the most current edition of NFPA 54 as
adopted by the Board; and
2. Product Approved side wall horizontally vented gas fueled equip-
ment installed in a room or structure separate from the dwelling, build-
ing or structure used in whole or par
t for residential purposes.
VENT AND AIR INTAKE MATERIALS
The vent and air intake system for direct or non-direct vent
installation must be 4” diameter PVC/CPVC schedule. 40 pipe,
or UL listed single wall 4” diameter AL29-4C* stainless steel
material. The following manufacturers’ systems are approved
for use within a specified minimum and maximum equivalent
vent length in this manual.
When joining the var
ious components of the listed stainless steel
v
ent systems
, the manufacturers’ instructions should be closely fol-
lowed to insure proper sealing. Use sealant specified by vent sys-
tem manufacturer for sealing of pipe and fittings, if required. When
joining the PVC/CPVC pipe and fittings, follow the instructions pro-
vided in this man
ual.
All connections must be liquid and pressure
tight. DO NOT use galvanized flue pipe or any plastic-type materi-
als other than PVC/CPVC Schedule 40.
Manufacturer Type/System Sealant
Heat-Fab. Inc.
Saf-T Vent
EZ Seal
Not Required
ProTech System,
Inc.
FasNSeal Not Required
Fle
x-L Inter
national
Inc.
StaR-34 GE-IS806
Z-Fle
x, Inc.
Z-V
ent
GE, R
TV 106
Metal-F
ab
, Inc.
Corr Guard Not Required
N/A
PVC pipe,
Schedule 40
PVC primer
and cement
N/A
CPVC pipe
,
Schedule 40
CPVC pr
imer
and cement