Vent Information
A. Venting Termination Minimum Requirements
J or K
X
V
M
I
H
A
V
G
B
V
V
A
B
V
F
V
C
B
B
E
L
V
D
V
Electrical
Service
V
N
V
N
V
N
N
V
Inside Corner
FIXED
CLOSED
OPEN
OPEN
FIXED
CLOSED
V
X
G
G
Termination Cap
Air Supply Inlet
Gas Meter
Restricted Area
O
P
Figure 9.1
NOTICE:
Termination must exhaust above air inlet elevation.
It is recommended that at least 60 inches (1.5m) of vertical
pipe be installed when appliance is vented directly through a
wall. This will create a natural draft, which will help prevent
the possibility of smoke or odor venting into the home during
a power outage.
It will also
keep exhaust from causing a nuisance or hazard
by exposing people or shrubs to high temperatures.
The safest and preferred venting method is to extend the
vent vertically through the roof or above the roof.
A 1 in. Above Finish Grade (the grade surface
must be a non-combustible material
B 1 in.
8 in. no OAK
Open door or window: below or to the side
B 1
 in. Open door or window: above
C 6 in. Permanently closed window: above, below
or to the side
D 18 in.
6 in. no OAK
V
ertical clearance to a ventilated soft
located above the terminal within a hori-
zontal distance of 
ft from the center-line
of the terminal
E 1 in. Clearance to unventilated soft
F 1
in. Clearance to outside corner
G 1
in. Clearance to inside corner
H 6 in. Above gas meter/regulator measured from
horizontal center-line of regulator
I
6 in. USA
7 in. Canada
Clearance to service regulator vent outlet
J 1
 in.
8 in. no OAK
Clearance to non-mechanical air supply
inlet to the building or the combustions air
inlet to any other appliance
K 10 ft horizontal
ft vertical
Clearance to mechanical air supply
L 7 ft.
Above paved sidewalk, paved driveway
located on public property
M 1 in. Under an open veranda, porch, deck or
balcony
N See Note
below*
Electric service: above, below or to the
side (location must not obstruct or interfere
with access)
O  in. Adjacent building, fences and protruding
parts of the structure
P 1 in. Clearance above roof line for vertical
terminations
All minimum clearances are listed with an Outside Air Kit (OAK) installed, unless otherwise noted in table below.
 in. Above grass, top of plants, wood or any other com-
bustible
1 in.
6 in. no OAK
Clearance from any forced air intake of other appli-
ance
1 in. Clearance horizontally from combustible wall
15 in. Vented directly through a wall, minimum length of
horizontal pipe
6
in. horizontal
1 in. vertical
Minimum horizontal or vertical terminations must
protrude from wall
*NOTE: Consult local building, re ofcials or authorities having jurisdic-
tion. Local codes or regulations may require dif
ferent clearances.
NOTICE:
Do NOT Terminate Vent:
In any location that will allow ue gases or soot from enter-
ing or staining the building
In any location which could create a nuisance or hazard
In any enclosed or semi-enclosed area such as a carport,
garage, attic, crawl space, under a sun deck or porch,
narrow walkway
Closely fenced area, or any location that can build up
a concentration of fumes such as a stairwell, covered
breezeway, etc.