c. Assemble the crevice tool from the micro cleaning kit to
attach to a Shop Vac. Figure 36.1.
d. Use the crevice tool to nish cleaning the heat exchanger
ns. It is critical that the  exhaust exits at the back of the
rebox oor (left and right) be thoroughly cleaned. Figure
36.2. There are several ways this can done.
1. Use the crevice tool.
.
Attach a hose 1/ inch (1.7mm) in diameter and
approximately  feet (607mm in length to your vacuum
hose.
. Use a bottle brush and push the ash down to the
bottom. Remove the combustion (exhaust) blower
and then vacuum out the ash.
2 exhaust exits (left and right side) must
be thoroughly cleaned. Each exit is
approximately 4 inches wide, 1 inch
across and 3 inches deep.
Figure 36.2
Figure 36.1
NOTE It is normal to see a certain amount of wear of
the heat exchanger ns. You may notice some aking
and pitting on some of the pins. The heat exchanger
system will function as designed with as many as 15 of
these pins missing.
Loosen all 6 nuts, but do NOT Remove
f. Removing the Combustion (Exhaust) Blower
1. The combustion blower is mounted in the bottom right
rear of the appliance. Figure 36.3.
. Remove side
panel and then using an 11/ nut driver to
loosen all six nuts, but do not remove. Rotate the blower
and remove from the housing. Figure 36.4.
. Set the blower on the top of the housing. You do not need
to disconnect the wires.
. Vacuum out the exhaust area. Figure 36.5.
Figure 36.3
Figure 36.4
Vacuum out the exhaust area.
Figure 37.2
Loosen (6) Nuts
Remove