Quadra-Fire MTVERNON-AE-MBK Stove User Manual


 
R
R
R
August 13, 2009
7034-106F
Page 19
Mt. Vernon Pellet Stove (AE)
7
Appliance Set-Up
A. Leg Leveling System
Figure 19.3 - Bolt fully extended
Figure 19.2
Figure 19.1
1. Thread Allen bolts through nuts until ush. Figure 19.1.
The
Allen bolts and nuts are included in the component
pack inside the appliance rebox.
. Slide assembled nuts and bolts into slots on legs with
the nuts on the bottom. Figure 19.2. Use a 5/ in.
(.96mm) Allen wrench to adjust legs up and down to
desired level. Figure 19.3.
B. Outside Air Kit Instructions
1. Measure distance from oor to air vent opening in appli-
ance and mark location on wall.
Use saw to cut opening in wall. Cut a -1/ to  inch
(89-10mm) opening on inside wall and a  to -1/
inch (10-11mm) opening on outside of house.
. Use wire tie to secure ex pipe to collar assembly.
. Slide trim ring over ex pipe and run pipe through wall.
. Attach ex pipe (not supplied) to outside termination
cap with second wire tie.
5. Secure termination cap to outside surface.
6. Secure trim ring to interior wall.
CAUTION
Never draw outside combustion air from:
Wall, oor or ceiling cavity
Enclosed space such as an attic or garage
Figure 19.4
Termination Cap
Wire
Tie
Trim Ring
Wire Tie
Collar
 inchAluminum
Flex Pipe
(not included)
Included in Kit:  wire ties, 1 collar assembly,
1 termination cap assembly, 1 trim ring, fasteners.
NOTE: 3 INCH ALUMINUM FLEX PIPE NOT INCLUDED.
Tools Needed: Phillips head screw driver; wire cutters;
hole saw or jig saw.