Baxi Potterton 24 Eco HE Boiler User Manual


 
8.0 INSTALLATION
22
Publication No. 5111811
8.7 Fitting the Flue (Cont)
5. Mark dimension ‘Y’ on the flue as shown (Fig. 26).
Carefully cut the waste material from the flue,
ensuring that the ducts are square and free from
burrs.
6. The inner flue duct support bracket may be in the
waste portion of the flue. In this case retrieve the
bracket before discarding the waste.
7. Take the inner flue support bracket (if not already
fitted) and engage it over the flue duct. This will
centralise the flue and air ducts, and ease assembly
(Fig. 27).
8. Insert the flue through the hole in the wall. Fit the
elbow to the boiler adaptor, ensuring that it is
pushed fully in.
9. Draw the flue back through the wall and engage it
in the elbow. It may be necessary to use soap
solution or similar to ease assembly of the elbow
adaptor and flue (Fig. 28).
10. Make good between the wall and air duct
outside the building.
11. Fit the flue trim if required, and if necessary fit a
terminal guard (see Section 7.9 & 7.10).
VERTICAL FLUE
1. Only a flue approved with the Potterton Performa
24 Eco HE can be used.
2. For information on vertical flues consult the
Potterton Flue Guide brochure.
Flue Trim
Inner Flue Support Bracket
Y
Flue
Waste
Flue Elbow
Fig. 26
Fig. 27
Fig. 28