Baxi Potterton 24 Eco HE Boiler User Manual


 
4.0 TECHNICAL DATA
8
Publication No. 5111811
0
200 400 600 800 1000 1200
0.5
1
1.5
2
2.5
3
3.5
4
Metre (wg)
Flow Rate (l/h)
Pump - Available Head
0
5
4.5
Temperatures
C.H. Flow Temp (adjustable)
35°C to 85°C max (± 5°C)
D.H.W. Flow Temp
35°C to 65°C max (± 5°C)
dependent upon flow rate
This value is used in the UK Government’s Standard Assessment
Procedure (SAP) for energy rating of dwellings. The test data from
which it has been calculated have been certified by 0051.
SEDBUK Declaration For Performa 24 Eco HE
The seasonal efficiency (SEDBUK) is 87.3% (89.3% LPG)
Band B
Heat Input CH
Max Min
kW 24.8 10.6
Heat Output CH (Non-Condensing)
Max Min
kW 24 9.8
Electrical Supply 230V~ 50H
z
(Appliance must be connected to an
earthed supply)
Power Consumption 170W
External Fuse Rating 3A
Internal Fuse Rating
Fuse 2A Fast Blow to BS 4265
Appliance Category CAT II
2H 3P
Inlet Pressure (Natural Gas - G20)
mbar 20
Burner Injector (Natural Gas - G20)
15 x 1.18mm Diameter
Burner Pressure (Natural Gas - G20)
Max Rate Min Rate
mbar 10.2 ± 0.5 2 ± 0.2
Appliance Type C
12
C
32
Heat Output CH (Condensing)
Max Min
kW 25.2 10.1
Heat Input DHW
Max
kW 24.8
Heat Output DHW
Max
kW 24
Flue Terminal Diameter 100mm
Dimensions Projection 125mm
Outercase Dimensions
Casing Height - 780mm
Overall Height Inc Flue
Elbow - 965mm
Casing Width - 450mm
Casing Depth - 345mm
Clearances
Above Casing 200 mm Min
Below Casing 200 mm Min
Front 450 mm Min (For Servicing)
Front 5 mm Min (In Operation)
L.H. Side 5 mm Min
R.H. Side 5 mm Min (In Operation)
20 mm Min (See Note*)
*NOTE: The boiler can be operated with a
clearance of 5mm at the right. This is also
sufficient for routine maintenance.
However a clearance of 20mm is required
if it is necessary to remove the secondary
heat exchanger. This should be considered
when siting the appliance and in the event
of any subsequent alterations in the area
of installation
Weights kg
Packaged Boiler Carton 50
Installation Lift Weight 43.5
Connections copper tails
Gas Supply - 22mm
Central Heating Flow - 22mm
Central Heating Return - 22mm
Cold Water Mains Inlet - 15mm
DHW Flow - 15mm
Pressure Relief Discharge - 15mm
NO
x
Class 3
Electrical Protection IPX4D
Condensate Drain 1” BSP
LPG Propane - G31
Burner Injector 15 x 0.77mm diameter
Burner Pressure
Propane mbar
Inlet Pressures
mbar
Max Rate
21.8 ± 0.5
Min Rate
4.4 ± 0.2
37
Central Heating Primary Circuit
Pressures
bar
Safety Discharge 3
Max Operating 2.5
Min Operating 0.5
Recommend Operating 1-2
DHW Circuit bar
Pressures
Max Operating 8
Min Operating 0.2
Min Operating Pressure
at 11.1 l/min 0.9
Flow Rates l/min
DHW Flow Rate
@ 30°CRise 11.5
DHW Flow Rate
@ 35°CRise 9.8
Min Working
DHW Flow Rate 2.5
Pump
Available Head See graph below
Expansion Vessel - (For Central Heating
only. Integral with appliance)
bar
Min Pre-charge Pressure 0.5
litre
Max Capacity of
CH System 125
Primary Water Content 1.0
of Boiler (unpressurised)
Max Gas Rate (Natural Gas - G20)
(After 10 mins)
m
3
/h 2.62