Patterson-Kelley TBIG-03 Boiler User Manual


 
MODU-FIRE® FORCED DRAFT Gas-Fired Boiler
41
Boiler Serial # Model #:
Installation Name: City:
State: Zip: Phone:
Installer Name:
1. Factory Fire-Test: (copy from boiler label) 2. Sealed Combustion YES / NO
High Low 2a. Combustion Air Temperature ° F
Inlet Gas "w.c. "w.c. 2b. Approximate Elevation (ft)
Oxygen (O2) % % 3. Water Inlet temperature: ° F
Carbon Dioxide (CO2) % % 4. Water Outlet temperature: ° F
Carbon Monoxide (CO) ppm ppm 5. Water Flow (gpm)
Stack Temperature (net) ° F ° F 5a. Glycol ? YES / NO
Main Flame Signal Volts Volts 6. Operating Temperature Setpoint: ° F
Inlet Air Temperature ° F ° F
(from internal OR external control)
7. Gas Valve a.Low Fire Setting (N)
b.High Fire Setting (V)
Start-Up Field Test: DATE: 8. Approximate stack lengths:
High Low Ft. Horizontal
Inlet Gas "w.c. "w.c. Ft. Vertical
Oxygen (O2) % % Flue Pipe Diameter
Carbon Dioxide (CO2) % % 9. Electrical Supply Power L1 to L2 Volts
Carbon Monoxide (CO) ppm ppm L1 to N Volts
Stack Temperature (net) ° F ° F Less than 1 volt between neutral and ground YES / NO
Main Flame Signal Volts Volts 10. Total cycles:
Inlet Air Temperature ° F ° F 11. Total hours
Performed by:
code, time, and description
Additional Comments:
MODU-FIRE
Please return a copy to P-K, ATTN: Boiler Tech. Support Department
Patterson-Kelley • 100 Burson Street • E. Stroudsburg, PA 18301
Ph) 570-476-7261 Fax) 570-476-7247 www.pkboilers.com
®
FORCED DRAFT BOILER
START-UP REPORT
Date:
Address:
12. Any Faults? Describe with
Contact:
Type of Installation:
8.0 FIELD STARTUP REPORT