IDEAL INDUSTRIES HE18 Boiler User Manual


 
13
icos - Installation & Servicing
GENERAL
Safety valve setting 3.0 bar 2.5 bar 2.0 bar
Vessel charge and initial 0.5 1.0 1.5 0.5 1.0 1.5 0.5 1.0
system pressure bar bar bar bar bar bar bar bar
Total water content of system Expansion vessel volume litres
litres
25 2.1 2.7 3.9 2.3 3.3 5.9 2.8 5.0
50 4.2 5.4 7.8 4.7 6.7 11.8 5.6 10.0
75 6.3 8.2 11.7 7.0 10.0 17.7 8.4 15.0
100 8.3 10.9 15.6 9.4 13.4 23.7 11.3 20.0
125 10.4 13.6 19.5 11.7 16.7 29.6 14.1 25.0
150 12.5 16.3 23.4 14.1 20.1 35.5 16.9 30.0
175 14.6 19.1 27.3 16.4 23.4 41.4 19.7 35.0
200 16.7 21.8 31.2 18.8 26.8 47.4 22.6 40.0
225 18.7 24.5 35.1 21.1 30.1 53.3 25.4 45.0
250 20.8 27.2 39.0 23.5 33.5 59.2 28.2 50.0
275 22.9 30.0 42.9 25.8 36.8 65.1 31.0 55.0
300 25.0 32.7 46.8 28.2 40.2 71.1 33.9 60.0
Multiplying factors for
other system volumes 0.0833 0.109 0.156 0.094 0.134 0.237 0.113 0.20
8
SEALED SYSTEM REQUIREMENTS - continued
9
WATER TREATMENT
The icos boiler range have an ALUMINIUM alloy heat exchanger
IMPORTANT.
The application of any other treatment to this product may render the guarantee of Ideal
Stelrad Group invalid.
Ideal Stelrad Group
recommend water treatment in accordance with the Benchmark Guidance Notes on Water
Treatment in Central Heating systems.
Ideal Stelrad Group recommend the use of FERNOX-COPAL or MB1,GE Betz Sentinel X100 OR Salamander Corrosion
Guard inhibitors and associated water treatment, which must be used in accordance with the manufacturers' instructions.
For further information contact:
Notes
1. It is most important that the correct concentration of the water
treatment product is maintained in accordance with the
manufacturers' instructions.
2. If the boiler is installed in an existing system any unsuitable
additives MUST be removed by thorough cleansing.
BS. 7593:1992 details the steps necessary to clean a
domestic central heating system.
3. In hard water areas, treatment to prevent lime scale
may be necessary - however, the use of artificially
softened water is NOT permitted.
4. Under no circumstances should the boiler be fired
before the system has been thoroughly flushed.
Sentinel Performance Solutions
The Heath Business & Technical Park
Runcorn
Cheshire
WA7 4QX
Tel: 0800 389 4670
www.sentinel-solutions.net
Fernox Manufacturing Co. Ltd
Cookson Electronics
Forsyth Road
Sheerwater
Woking
Surrey
GU21 5RZ
Tel: +44 (0) 1799 521133
Salamander Engineering Ltd
Unit 24
Reddicap Trading Estate
Sutton Coldfield
West Midlands
B75 7BU
Tel: +44 (0) 121 3780952