High End Systems SHOWGUN Indoor Furnishings User Manual


 
SHOWGUN
®
User Manual 7
Chapter 2:
Setup and Configuration
SHOWGUN
®
fixture setup includes mounting, connecting to power and DMX
linking and configuration.
Use the following steps to set up and configure your SHOWGUN
®
fixture:
1. Unpack the fixture.
2. Install power cord cap for your location.
3. Mount the fixture upright or suspended from a standard truss.
4. Connect the fixture to a DMX controller via DMX cabling.
5. Connect the fixture to power.
6. Configure the fixture for DMX control.
Unpacking the Fixture
The SHOWGUN
®
fixture ships in a road case specifically designed to protect the product during
transport. When unpacking, inspect the fixture for physical damage to components. High End
Systems
®
assumes no responsibility for products that are damaged during transport. Return a
product for repair in its road case.
Before sending anything to the factory, call your High End Systems dealer/distributor
for a Return Material Authorization (RMA) number. The factory cannot accept any
goods shipped without an RMA number.
Installing a Power Cord Cap
The SHOWGUN
®
fixture’s custom power cord ships without a power cord cap. Use the
information in this section to install the correct power cord cap for your location.
Because of the variety of power cord caps used worldwide, High End Systems, Inc. cannot make
specific recommendations for the power cord cap. Contact a local authority for the type of power
cord cap needed. When installing the power cord cap, note that the cores in the mains lead are
colored according to the following code:
green and yellow = earth
blue = neutral
brown = live